They will begin with the 535 side and then move on to the 555 side.
They estimate needing at least 3-4 work days to work on each side.
While each area is being worked on and/or while the floor is drying, the area will be CLOSED. Please respect the closed area and do not approach or enter it until reopened.
Please use the open entry way, or the garage entrance, or the West side beach entrance instead.
DO NOT use the emergency exit doors, as that will set off the alarms, which will not stop by simply closing the door.